09 leads
Example leads board
Example data. These eight jobs are invented to show the idea. They are not real homeowner jobs and are not copied from Builderscrack or any other platform. In the live site, leads come only from homeowners posting on this site.
Example leads board
| ID | Suburb | Job | Plans | Timing | Lead tier | Consent note |
|---|---|---|---|---|---|---|
| EX-01 Example | Ponsonby | Rear villa extension: add one bedroom and ensuite. Plans not drawn yet. | No | Start in 3 to 6 months | Large, 75 credits | Likely building consent. Character-area rules may also apply. |
| EX-02 Example | Grey Lynn | Replace corrugated-iron roof on a 1920s villa, about 130 m2 of roof. | N/A | Within 3 months | Medium, 35 credits | Comparable replacement in same position is often exempt. Check the character-area rules. |
| EX-03 Example | Remuera | Full renovation: kitchen, two bathrooms, new flooring, repaint inside and out. | Concept sketches | Flexible | Large, 75 credits | Wet-area changes and added fixtures normally need consent. Plumbing by an authorised person. |
| EX-04 Example | Albany | New three-bedroom build on a flat section, architect plans complete. | Yes | Start when consent issues | Large, 75 credits | Building consent needed. Check subdivision covenants. |
| EX-05 Example | Glenfield | Convert an under-house basement into a bedroom and bathroom. | Yes | Within 2 months | Large, 75 credits | Building consent normally needed for habitable space. |
| EX-06 Example | Pakuranga | New 30 m2 ground-level timber deck with a short balustrade. | No | Before summer | Medium, 35 credits | Often no building consent if the fall is under 1.5 m. Resource consent rules may still apply. |
| EX-07 Example | Papakura | Bathroom renovation: replace bath with a tiled shower, new vanity and toilet. | No | Within 6 weeks | Medium, 35 credits | A tiled wet-area shower can need consent. Plumbing by an authorised person. |
| EX-08 Example | Glen Eden | Extend carport roof by about 2 m and add a short deck railing. | No | Flexible | Small, 12 credits | Ground-level carport up to 20 m2 can be exempt. Check LBP supervision limits for 20 to 40 m2. |
Budgets are not shown. Lead prices are sample credits, not real charges.
How proof-gated bidding would work (planned)
- A builder must first verify LBP status, insurance, NZBN and reviews.
- Credits are held when a builder bids, and charged only when the lead is released.
- Junk leads (duplicate, wrong suburb, fake, unreachable within 72 hours) are refunded automatically.
- At most three builders per lead. Paid priority is disclosed. Bids decide lead access, never quote rank.